China Mold OEM Tooling Maker Plastic Products Injection Mould Fan Cover
Qingdao Chengenxin Industrial And Trade Co.,Ltd , located in the beautiful seaside city Qingdao China , We do profession
Description
Basic Info.
Model NO. | CEX-02 |
Customized | Customized |
Material | Plastic |
Application | Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery |
Tolerance | 0.1mm |
Transport Package | Carton Box |
Specification | OEM |
Trademark | CE |
Origin | Qingdao, China |
HS Code | 3926901000 |
Production Capacity | 1000tons/Month |
Product Description
Qingdao Chengenxin Industrial And Trade Co.,Ltd , located in the beautiful seaside city Qingdao China , We do professional manufacture Injection Mould , Plastic injection part, Die casting Process . Any style needed welcome asking us for quotation!!!!
Product Description
China Mold Tooling Maker Plastic Products Injection Mould Fan Cover
Product Name | Plastic parts | |
Material | ABS, PC, PP, PS, POM, PMMA,PBT,PVC,PA6,PA66,PA66+30%GF, PTFE,PC+ABS,TPE,etc | |
Surface Finish | Color painting,Texture,Silk-printing,Vacuum coating,rubber coating, etc. | |
Cavity Variety: | One-stop solution,Multi-cavity mold,Family plastic mold,Hot runner plastic mold | |
Quality Control | ISO/TS16949:2002 and ISO14001:2004 system | |
Business Scope | Mold and parts designing and making,Parts machining,Injection molding, CNC prototype manufacturing | |
Mold Processing | CNC EDM machine processing then assembly and trial | |
Color | Red, blue, green, yellow,all pantone colors and RAL colors |
Product Show
Factory workshop PackingFAQ
1. Are you manufacture factory ? Yes ,we are in Qingdao China ,welcome to visit our factory 2.Could I get free sample ? If we have in stock ,free sample will be available, new developing part need charge mold or tool fee then samples for free . 3.What is your Leading time Mould 8-15 days , for production depend on the products normally 15-30days . 4.What is your payment term Tooling or Mold 100% deposit For Bulk order : 30% deposit, 70% before shipping
7-Days 24 Hour , any style needed welcome asking us for quotation .
Prev: CE Approved Yd Variable Speed Motor for Ventilator with Aluminum
Next: Stainless Steel Deep Drawing Parts Electric Motor Fan Cover
Our Contact
Send now